The main access to the premises optimizes the office space and the use of furniture, giving way to the core of the stairs and elevator that connect the three floors. In the first basement, a diaphanous distribution space is generated with common areas with access to the different video and sound post-production rooms following the precise lighting and acoustic requirements. In the second basement, the three post-production rooms are connected to the diaphanous distribution space, which in turn offers an open work and office space.